Services · Phase A
Technical assessment
Before proposing a rack, we review your warehouse on site. We visit and survey to understand your operation, your building and your load.

When to request it
Does any of this sound familiar?
The assessment is the starting point when you do not yet know which system you need.
- You are short on space and don't know whether it is better to reorganize or expand
- You are going to open, move or redesign a warehouse
- Your product, pallets or handling equipment changed
- Your rack has dents or you don't know how much it can hold
- You want to know how many positions you can gain before investing
During the visit
What we review
WarehouseDimensions, clear height, columns and docks.
Product and loadPallets, weights, dimensions and number of SKUs.
OperationFlows, turnover and inventory volumes.
Handling equipmentForklifts, reach and aisle widths.
Current systemCondition of the existing rack, if any.
Phase A · Assessment
How we do it
01
Assessment
We understand your operation, product and challenges.
02
Site survey
Survey of the warehouse, pallets and handling equipment.
03
Operational analysis
Flows, turnover and inventory volumes.
04
Layout and proposal
Optimal layout and system alternatives.
05
Engineering
CAD design and structural calculation.
06
Capacity simulation
Positions and capacity before you invest.
Request your technical assessment.
Tell us about your storage challenge and we'll schedule the visit.
